Project Site, 160 ACRES of Land (square / rectangular geometry of the most useful & effective for designing and implementing Greenhouse holds), will be used by the whole thing.
In this scheme, only the administrative area covered by greenhouses, 112 ACRES, and the rest of the building units, will be Cold Storage, Warehouse, Motor Park, Management Office, and Staff Accommodation & Recreation Space, Landscaping & Exterior (including increased capacity or other devices attached appendices supplement the project).
A-2) The Preliminary Cost of the Project
Preliminary project costs are including the costs of licensing, testing of water and soil mechanics, technical feasibility and economic design, painting, etc. The total amount of speculative buying is 144 000.00 U$D.
A-3) Building Requirements
Advanced Description:
Performance of structures such as roofs and walls around the room Work Area the companies that sell equipment that was on the table the cost of machinery, tools and equipment is calculated but internal Wall – Make and all cases relating to the operations of local construction (such as tables, chairs, etc.) the custodian is a project of the calculation are: Toilets inside the Greenhouse / the local techniques
Following construction, equipment vendor companies which are responsible for all costs in the table are calculated and machinery, tools and equipment are included:
(120 m2) Storage Tanks, plant Nutrition & Food
(45 m2) Back Water Storage Tanks
(500 m2) Atmosphere Packaging, Storage and Warehouse Outlet
(230 m2) Heating Homes
(2000 m2) Cold Store
Water storage tanks of 45 m3, outside the Work Area, located in free space will be the perfect preparation for it, the seller of the equipment.
The site plan to set up two deep water wells, mining and electric motor, with sufficient flow rate (or the same amount of water currently available) is required.
A-4) Machinery & Equipment (Local Origin)
– The use of natural gas as fuel, the fuel tank depot, used in emergency.
A-5) Structure & Its accessories (European Source)
B. Ongoing Costs:
B-1) Cost of Energy
B-2) Estimated Cost of the Required Human Resources
B-3) Costs of Needed Inputs
B-4) Cost of Maintenance
B-5) Cost of Insurance
B-6) Depreciation Cost
B-7) Plan’s Current Spending
C. Plan’s Production & Value of Production
C-1) Annual Main Production (Classic Tomato)
Finally, per square meter, of at least 70 Kg / Year, the Classic Tomato harvest is good. In the contract, the first product to be released next year and the guaranteed purchase price for the product is correct. Price / Kg of product, equivalent to 2 U$D / Kg (Farm – Gate), has been considered.